2026 ROAD IMPROVEMENT PROJECTS

Traffic impacts and other pertinent information will be posted prior to the start of each of the following 2026 road improvement projects: 

PAVING (Summer – dates to be determined):

  • Wincrest Avenue - from CR31 to Wellings boundary - 0.35 km
  • Marionville Road - from Rodney Lane to Bisson Road - 3.0 km
  • Irish Headline Road - from CR16 to CR1- 4.0 km
  • Winchester Springs Road - from CR31 to Gary Road - 2.8 km
  • Forward Road South - from Nation Valley Road to Nesbitt Road - 1.7 km
  • Nation Valley Road - from Forward Road South to northside of bridge - 1.8 km
  • River Road - from northside of bridge to CR31 - 3.8 km
  • Guy Road - from Pemberton Road to CR3 - 3.7 km

CULVERT REPLACEMENTS (Summer - dates to be determined):

  • Forward Road S. at Nesbitt Road - June 22

    Image
    Forward Rd. S. at Nesbitt - Culvert Replacement - June 22, 2026
  • Forward Road South at Nation Valley Road - June 23-24

    Image
    Forward Rd South at Nation Valley Rd- Culvert Replacement-June 23-24, 2026
  • 12758 Nation Valley Road - June 25-26 

    Image
    Map-12758 Nation Valley Rd -Culvert Replacement-June 25-26, 2026
  • River Road between #12689 and #12667 - June 29-30
  • River Road at #12667 - July 6-7
  • River Road at #12531 - July 8-9

    Image
    Map-River Rd-Winchester-Road Closures-June_July 2026
  •  River Road at #12320 - July 13

    Image
    Revised Map- Culvert replacement on River Rd at 12320 north east of CR31
  • 12410 Nesbitt Road
  • VanCamp Road west of CR3 
  • Ormond Road at Oshman Park
  • Northwing Road near CR3 
  • Link Road - east end

MAINTENANCE STONE ON UNPAVED ROADS (Summer):

Gravel road maintenance on the roads listed below will begin on Monday, July 6 and continue throughout the month of July.

This annual maintenance is necessary to help preserve and improve the condition of the Township's gravel road network. Residents and motorists are asked to exercise caution when travelling through work areas by reducing their speed, watching for maintenance equipment and trucks, and following any directions provided by workers.  Minimal disruption to traffic is anticipated, and access to private properties will be maintained throughout the maintenance period. Temporary delays may occur while work is underway, and we appreciate your patience and cooperation as crews complete this important work. 

  • Pepperville Road – from CR1 to dead-end - 1.8 km - Completed July 6th
  • Norton Road – from Pepperville Road to Van Camp Road - 1.2 km - Completed July 7th
  • Levere Road – from CR3 to dead-end - 0.7 km - Completed July 7th
  • Ormond Road - from Bisson Road to CR13 - 3.3 km - Completed July 9th 
  • Spruit Road - from Riddell Road to dead-end - 1.1 km - Completed July 10th
  • Kerrs Ridge Road -  100m east of civic #11125 to Spruit Road - 4.0 km - Completed July 15th
  • Crowder Road – from CR43 to Levere Road -  2.5 km - Completed July 16th
  • Webb Road - from Nesbitt Road to Winchester Springs Road - 1.4 km 

MOWING PROGRAM:

The annual mowing program throughout the Township, including long-arm mowing and manual trimming around guardrails, commences in early June.  

 WEED SPRAYING (May and June): Completed

Roadside weed spraying takes place in May and June of each year. Spraying occurs from the edge of the gravel shoulder to within one metre of the property limits and uses selective, Government of Canada-approved herbicides to control the growth of undesirable vegetation. The contractor performing the work is fully licensed.  Spraying occurs in areas identified during regular weed audits.   

No-Spray Signage: 

If you do not want the right-of-way in front of your property to be treated:

  • You must post “NO SPRAY” signs at the start and finish of your property and notify the Township’s Transportation Services Department well before weed spraying starts in May.
  • The “NO SPRAY” signs must be at least one foot by two feet and located three feet from the edge of the gravel shoulder. Signs must be one foot above any vegetation so that it is easy to see from the road. 

Spraying will not occur if the ditch is mowed on a regular basis (maintained as a lawn).  To ensure that spraying does not occur, we recommend you install a sign regardless of how the ditch is maintained.

See the map below indicating which areas within the Township of North Dundas that will be sprayed in 2026.  

Image
2026 ND Weed Spraying

 

 

 

    Add new comment

    We will not share your email.

    Plain text

    • No HTML tags allowed.
    • Lines and paragraphs break automatically.
    • Web page addresses and email addresses turn into links automatically.
    CAPTCHA